BB's clean up and re-design, rebuild

BoomerBloomer57

Well-Known Member
first things first,,

Cleaning out the shed, stripping all equipment out for cleaning and sanitizing. EVERYTHING MUST COME OUT!

water and bleach mop down of all surfaces.

I need to implement some mods i thought up and should be done in 1 week.

i'll be switching this over to the grow journal for the rebuild and set-up.



boomerb is a master tinker
when b's stoned he's a mad thinker,
if b ain't done in one weeks time
sweet red will b tanning ol' b's b hind


ftp
 

Attachments

Top