Yea 20 cfl's in all lots of wires tho
I thought about 2 weeks, thing is that cuboard is at the side of my electric meter cuboard, and i have some electricians coming to replace my electric meter at some point next week. So no power during the day (during my light cycle) and also i dont want them putting two and two together, with the smell and all