New setup

MItonic

Well-Known Member
New setup will be fully complete in the next 2 days. Waiting on a cpl missing parts and were off! Plants going in this Friday. Original lumpys cut of apple fritter.

Pics are system in its current state.

18g totes
30g rez
2in feed lines
1in return line
1in waterfall manifold feed
3/4" waterfalls (2 per tote)
Throttle valves for each totes waterfalls
1200 gph danner pump for undercurrent system
2250 gph pump for waterfall system
1/2hp chiller for system
 

Attachments

J232

Well-Known Member
Looks good, how did you calculate 2250 gph for 36 3/4” waterfalls? I run a 1800gph mag drive on 3/4” line nozzled to 2 - 5/16” holes per site.
 

MItonic

Well-Known Member
Looks good, how did you calculate 2250 gph for 36 3/4” waterfalls? I run a 1800gph mag drive on 3/4” line nozzled to 2 - 5/16” holes per site.
I didnt really calculate honestly. I may have to bump up to a 3500gph danner. The falls will have end caps with holes drilled for jet like effects and fall effects. So essentially there should be back pressure somewhat on the pump, im not just leaving them open ended.
 

MItonic

Well-Known Member
Well i did in fact upgrade to a 4800gph pump. The 2250 gph was decent but i just wanted more power and more waterflow. Should be here in 3 days so i will update how it pans out
 
Top