a2lute
Well-Known Member
So after seeing Renfo's grow I decided to add some side lighting. I tried some QB's in my veg tent and I like them, but the LED's could stand to be spaced out better. I found some LM301B strips, made a quick plan, and got them on order! I expect more parts to trickle in over the next few days but here's what I've been up to
![Strip build (3).jpg](/data/attachments/3620/3620221-16a771f52409b73b092c179dbd8ea0bc.jpg)
![Strip build (4).jpg](/data/attachments/3620/3620222-9ddd1a69325800e4688018eb0b709c71.jpg)
Cut up 25 or so feet of aluminum strap, tack down some keystock to make a quick jig. And yes, that upper middle key stock did get welded down crooked, had to redo that...
![Strip build (1).jpg](/data/attachments/3620/3620224-8df316519ad88dcef1bbb009d14db023.jpg)
![Strip build (2).jpg](/data/attachments/3620/3620225-70c1b8776fc1c7a6e5a2ae37b205bf54.jpg)
Tacked up pile, then a welded pile! Since the tacks were all on the back the frames were pulled in a bit of a bow, I tapped them flat with a small mallet and welded the backside to hold them down. I didn't weld this fully solid, just some stitch welds at each joint. The side with the tacks will get flattened with a flap sander, then I can get started drilling and tapping mounting holes.
![Strip build (3).jpg](/data/attachments/3620/3620221-16a771f52409b73b092c179dbd8ea0bc.jpg)
![Strip build (4).jpg](/data/attachments/3620/3620222-9ddd1a69325800e4688018eb0b709c71.jpg)
Cut up 25 or so feet of aluminum strap, tack down some keystock to make a quick jig. And yes, that upper middle key stock did get welded down crooked, had to redo that...
![Strip build (1).jpg](/data/attachments/3620/3620224-8df316519ad88dcef1bbb009d14db023.jpg)
![Strip build (2).jpg](/data/attachments/3620/3620225-70c1b8776fc1c7a6e5a2ae37b205bf54.jpg)
Tacked up pile, then a welded pile! Since the tacks were all on the back the frames were pulled in a bit of a bow, I tapped them flat with a small mallet and welded the backside to hold them down. I didn't weld this fully solid, just some stitch welds at each joint. The side with the tacks will get flattened with a flap sander, then I can get started drilling and tapping mounting holes.